Skybrokers de-installed 30+ antennas at DMC Amsterdam, The Netherlands

Skybrokers de-installed 30+ antennas at DMC Amsterdam, The Netherlands
In January 2018 Skybrokers conducted its largest project to date by de-installing five earth station antennas (2x Andrew 4.5m & 3x Andrew 5.6m antennas) and 25+ VSAT antennas from a 4-story office building in Amsterdam, The Netherlands.
This challenging project took two weeks with incredible help of the customer and contractors. The majority of the VSAT antennas were scrapped and metal was recycled. The Earth Station Antennas were disassembled and transported back to our facility in Central Europe where they will be completely refurbished and prepared for re-installation.
- Antennas were moved to zenith position.
- 25+ VSAT antennas with mounts and ballast to be removed.
- 3x Andrew 5.6m antennas to be removed.
- Lifting the Andrew 4.5m antennas.
- A 60m tower crane was arranged.
- Lifting of the 5.6m antenna starts.
- Lifting of the 5.6m antennas.
- Prepare the 5.6m tripod mounts for lifting.
- All antennas were taken to ground level for disassembly.
- Removal of 2x Andrew 4.5m antennas.
- The crane could reach the far edges of the roof.
- Andrew 4,5m antenna.
- Disassembly on ground level.
- Disassembly of the 5.6m antennas on ground level.
- Disassembly 5.6m antennas and mounts on ground level.
- Removal of 25+ VSAT antennas with mounts and ballast.
- Metal was recycled.
- All large antennas were loaded into dedicated trucks.
- Ballast was removed from the roof.
- VSAT antennas and mount taken apart for recycling.
- 3x 5.6m antennas with mounts to be dismantled.
- We needed full parking lot for disassembly,
- Skids were hired for waste disposal.
- Special trucks were hired for easier disassembly.
- Last truck leaving the site.
- All large antennas were removed.
- Roof was cleaned.
- Parking lot cleaned.